Following on from last week's post I managed to get some more work done on the downstair toilet over the last 2 weeks.
- Ducting pipes installed under the floor for electrics and any future services.
- Hardcore compacted and levelled off with some builders sand.
- 50mm Kingspan insulation sheets laid over the hardcore base. I allowed openings for toilet and shower service access.
- Rerouted the existing water supply pipe through one of the ducts.
I am hoping to get a few strong friends over this weekend to help with mixing the screed and floating the floor.